OpenRail DesignerCONNECT Edition

Using the Fill Area

This site has excess cut from the building pad basement excavation and the optimizer is raising the Driveways and Parking Lot to waste the cut.

Using a Fill Area allows for excess cut to be wasted to a designated location and the impact on the Driveways and Parking Lot is less.